Loading...
HomeMy WebLinkAboutRES2023-064 Financial Engineering Company Contract CITY OF SEWARD,ALASKA Sponsored by: Regis RESOLUTION 2023-064 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA, AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH THE FINANCIAL ENGINEERING COMPANY IN AN AMOUNT NOT-TO-EXCEED $55,350 TO CONDUCT AN ELECTRIC RATE STUDY SO THAT CUSTOMER RATES CAN BE SET APPROPRIATELY TO RECOVER EXPENSES AND GENERATE A REASONABLE FINANCIAL RETURN TO THE CITY'S GENERAL FUND WHEREAS, The Financial Engineering Company is led by Mike Hubbard, an expert in rate making who has assisted the City of Seward with rate increases since 2008; and WHEREAS,the City's electric department is facing significant increases in expenses related to deferred maintenance on its transmission infrastructure and substations, higher costs for supplies and materials,higher costs for consulting services, and overall increases in inflation; and WHEREAS, the City's electric department must begin paying interest in 2023 and in 2025 paying on the principal of the $10 million revenue bond secured in 2022, a total amount which ranges from $441,750.00 to $595,250.00 annually; and WHEREAS, the rate study would get underway in mid-June with approved increases in customer rates implemented no later than January 1, 2024; and WHEREAS, the increase in customer rates would be based upon"cost of service"to ensure rates accurately reflect the expenses incurred to serve each customer classification; and WHEREAS, the proposed rates increase for each customer classification would be presented to City Council for approval by The Financial Engineering Company in late summer or early fall of 2023. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEWARD, ALASKA that: Section 1. The City Manager is hereby authorized to enter into a contract with The Financial Engineering Company to conduct a electric rate study to appropriately set customer rates no later than January 1, 2024. Section 2. Funding in an amount not to exceed $55,350, including expenses related to travel and lodging to perform discovery/due diligence and to present the rate study findings to Council,is hereby appropriated from 15000-3000-7009. CITY OF SEWARD,ALASKA RESOLUTION 2023-064 Section 3. This resolution shall take effect immediately upon adoption. PASSED AND APPROVED by the City Council of the City of Seward,Alaska,this 22nd day of May, 2023. THE CITY OF SEWARD,ALASKA cc914.11 Sue McClure,Mayor AYES: Osenga, DeMoss, Calhoon, Wells, Finch, Barnwell, McClure NOES: None ABSENT: None ABSTAIN: None ATTEST: vV Kris Peck Deputy City Clerk (City Seal) ,,,olt of SE A.,*,,, /..."0e9 r s ' SEAL is 2 • i '-"ate i a �'��f�OF`p,..P.. City Council Agenda Statement Meeting Date: May 22, 2023 To: City Council Through: Norm Regis, Acting City Manager From: Rob Montgomery Subject: Resolution 2023-064: Authorizing The City Manager To Enter Into A Contract With The Financial Engineering Company In An Amount Not-To- Exceed $55,350 To Conduct An Electric Rate Study So That Customer Rates Can Be Set Appropriately To Recover Expenses And Generate A Reasonable Financial Return To The City's General Fund. Background and justification: For electric utilities, having customer rates set appropriately is critical to the financial health of the organization. The City's electric department must increase its customer rates no later than January 1, 2024 to effectively recover its expenses and generate a reasonable return to the City's general fund. Beginning in 2025, the City will begin making payments on the principle of its $10 million revenue bond, issued in 2022 to assist the City with its transmission infrastructure and substations rebuild project. The amount of this annual payment of principal and interest ranges from $441,750.00 to $595,250.00. The utility is also facing significant increases in expenses related to higher costs for supplies and materials, higher consulting services costs, and overall increases in inflation. If approved, the rate study will get underway in mid-June with a presentation being made to Council by The Financial Engineering Company in late summer or early fall. Any increase in rates would be based upon "cost of service"to ensure rates accurately reflect the expenses incurred to serve each customer classification. The Financial Engineering Company is led by Mike Hubbard, an expert in rate making who has assisted the City of Seward with rate increases since 2008. Seward's last rate study was conducted in 2021. The most significant results of that stud included the creation of a new Industrial rate classification for Seward's largest users of power and residential customers with average usage were given an increase of about $2 on rates. However, this amount was offset by an approximately $2 reduction in the Cost of Power Adjustment (COPA) for customers, which was a result a true up on the COPA for the Alaska SeaLife Center. Comprehensive and Strategic Plan Consistency Information This legislation is consistent with (citation listed): Comprehensive Plan: 3.7.1.3 "Continue to improve the quality and efficiency of city governmental services." Strategic Plan: Other: 123 Certification of Funds Total amount of funds listed in this legislation: $ 0 This legislation (✓): Creates revenue in the amount of: $ x Creates expenditure in amount of: $ $55,350 Creates a savings in the amount of: $ Has no fiscal impact Funds are (✓): X Budgeted Line item(s): 15000-3000-7009 Not budgeted Not applicable Fund Balance Information Affected Fund (✓): General SMIC X Electric Wastewater Boat Harbor Parking Water F1 Healthcare Motor Pool Other Note:amounts are unaudited Fund Balance/Net position — unrestricted/unassigned $ 6,298,233 Available Unrestricted Cash Balance: $ 7,433,978 Finance Director Signature: --��� Attorney Review RYes Attorney Signature: Not applicable Comments: Administration Recommendation eAdopt Res Other: 124 the Financial Englneering Company 235 Rockland street,Rockport,Maine 04856 Cell/Text: (207)691-8347 wwvv.FinEngCo.com E-mail: mhubbard(a FinEngCo.com April 23, 2023 Mr. Rob Montgomery, Electric Utility Manager City of Seward PO Box 167 Seward, Alaska 99664 Dear Rob: Attached is a proposed scope of service and budget for a Cost of Service/Rate Design study for the Electric Utility. If you have any questions regarding the attached material, please do not hesitate to call or text me at (207) 691-8347. Very truly yours, THE FINANCIAL ENGINEERING COMPANY /u el/i 7), G MICHAEL D. HUBBARD 126 CONTRACT The Financial Engineering Company ("FEC") shall provide the following work for the City of Seward ("City") regarding a cost-of-service/rate study for the City's Electric Utility. METHODOLOGY Overall—A cost-of-service study is to be performed that properly allocates the Electric Utility's revenue requirements to each customer class. Although the utility is not rate regulated by the Regulatory Commission of Alaska ("RCA"),the work will be performed using the guidelines set by the RCA for regulated utilities. Thus, revenue requirements will be allocated to each customer class using appropriate functionalization, classification, and allocation factors set forth in the cost allocation manual developed by the National Association of Regulatory Utility Commissioners (the "NARUC Manual"). Rates will then be designed such that the revenues collected from each customer class will be approximately equal to the allocated revenue requirements. In this way, the "cost causer" becomes the "cost payer." It is noted that although the Electric Utility is not rate regulated, a potential purchaser of the utility is regulated. That utility will be interested not only in the results of the study but the underlying analysis and assumptions. Therefore, models developed for this study will be structured to be easy to follow by third parties and available for distribution at the City's request. The last cost-of-service study performed several years ago resulted in the development of an Industrial rate for several large customers, with the Alaska Sea Life Center transitioning from a special contract to the Industrial rate. The analysis in this study will include a review of the Industrial rate and whether the assumptions used in establishing the rate remain valid. Task 1 -Data Request. A data request will be prepared and forwarded to the City. Once the data is received, it will be reviewed and a preliminary analysis will be performed regarding potential rate classes, revenue adequacy and other metrics. Task 2—Initial Meeting. Once the preliminary analysis is performed, FEC will travel to Seward to meet with City staff. The purpose of the meeting is to: • Review the proposed scope of work and make necessary clarifications, modifications, or additions. • Review data collected from the initial data request and obtain supplemental information as necessary. • Discuss known factors that will change historical operating results to better reflect on-going expenses. • Discuss billing history and how billing determinants may change in the near future. - 1 - 127 • Discuss future betterments that are planned, the anticipated costs, and methods of financing. • Develop projections of an operating budget for 2025 (see Task 3). Task 3 — Model Update/Analysis. The Revenue Requirements/Cost-of-Service/Rate Design model developed for previous studies will be updated and modified to provide two years of historical expenses, the 2023 budget, and projections for 2024 and 2025. Expenses for 2024 will be taken from the current budget, but 2025 expenses will be developed through discussions with the City. Billing determinants will be equal to recent history but modified based on conversations with staff. The model will then allocate the revenue requirements to the various customer classes based on industry-accepted principles. In general terms,variable costs are allocated based on each class' respective energy requirements,fixed generation and distribution costs allocated based on each class' contribution to coincident and non-coincident peak, and customer-related costs based on number of customers. At times, direct assignments are used where costs can be attributed to a specific customer class. Demand data is typically difficult to obtain for those classes that are not demand metered, but FEC has developed methodologies for estimating these amounts, and these methodologies have been accepted by the Regulatory Commission of Alaska. The model will be developed using the Excel platform. Task 4 — Rate Design. The rate model will determine the adequacy of rates under several scenarios. These scenarios include the following. • Overall adequacy. The total utility revenues projected to be collected for 2024 and 2025 will be compared to the total utility revenue requirements for each year based on existing rates. • Individual Rate Class. How close the rates of each rate class are set to cost-of-service will be determined by comparing the revenue requirements allocated to the rate class to the projected collected revenues from the rate class. Specific rates for each class will then be developed such that projected revenues are reasonably close to the allocated cost of service. If rate adjustments are required, several options shall be developed for consideration. Tasks—Other Rates. Rates of the Railbelt utilities and selected other utilities within the State will be collected and a comparison made to those of Seward. The comparison will be made for each rate class of Seward and will show monthly bills for various usage levels. The comparison will separate base rates and fuel cost adjustments. Task 6 — Written Report. A written report describing the analysis and findings will be prepared. The report shall also make reference to industry-accepted practices so that the reader will know that the analysis was performed with no hidden agendas and would meet - 2 - 128 the requirements of an RCA review. The report shall be written such that those not knowledgeable of the electric utility industry can understand the work performed. Task 7—Presentations. FEC will travel to Seward and present the results to the City Council. The presentation shall summarize the report and provide the Council and public opportunities to have any questions and concerns addressed. The presentation will include a review of current and proposed rates and the calculation of a customer's bill for each rate class. Task 8—Refinement. The analysis, rate development, and report will be refined, if required, based on any concerns of the Council. BUDGET A budget to perform the scope of work has been prepared and is summarized in Attachment 1. The budget is based on two site visits (preliminary and presentation). Should a second meeting with Council be required, costs for that work and meeting are separately identified. The work can be performed on a fixed-fee basis or a time and materials with the total billing not to exceed the amount shown in the Attachment. Approved by: Michael D Hubbard Norm Regis, Acting City Manager the Financial Engineering Company City of Seward Approved by the Seward City Council on - 3 - 129 CITY OF SEWARD- ELECTRIC DEPARTMENT RATE STUDY Budget TASK HOURS Labor Expenses Total 1 Data Request 4 $ 1,000 $ 1,000 2 Initial Meeting/Data Collection Labor 24 6,000 Air Fare 2,250 Surface Transportation 500 Hotel 1,000 Meals 200 Subtotal 24 6,000 3,950 9,950 3 Model Modification/Analysis 40 10,000 10,000 4 Rate Design 24 6,000 6,000 5 Other Rates 8 2,000 2,000 6 Report 36 9,000 9,000 7 Presentation aind Preparation Labor 20 5,000 Air Fare 2,250 Surface Transportation 500 Hotel 750 Meals 200 Subtotal 20 5,000 3,700 8,700 TOTAL 156 $ 39,000 $ 7,650 $ 46,650 8 Second Presentation Labor 20 5,000 Air Fare 2,250 Surface Transportation 500 Hotel 750 Meals 200 Subtotal 20 5,000 3,700 8,700 TOTAL 176 $ 44,000 $ 11,350 $ 55,350 - 4 - 130