Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />Deleted <br /> <br />Sponsored by: ~ <br /> <br />CITY OF SEWARD, ALASKA <br />RESOLUTION 2000-088 <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, <br />ALASKA, APPROVING A SPECIAL SERVICES CONTRACT WITH FLOYD <br />M. AINSWORTH, DBA AINSWORTH CONSULTING, FOR INSPECTION <br />SERVICES FOR CONSTRUCTION AT FT. RAYMOND SUBSTATION <br />RELATED TO THE INSTALLATION AND INITIAL OPERATION OF AN <br />EMD-20 DIESEL GENERA TOR NUMBER SIX <br /> <br />WHEREAS, the City Council approved the purchase of an EMD- 20 generator to be installed <br />as generator number six at Ft. Raymond Substation; and, <br /> <br />WHEREAS, tht' City Council approved a contract with Cook Inlet Contracting to do the <br />necessary modifications to the structures at Ft. Raymond Substation to accommodate the new <br />generator; and <br /> <br />WHEREAS, the City requires a full time inspector on the site to ensure full and complete <br />compliance with the engineer's specifications; and <br /> <br />WHEREAS,a qualified inspector in the person of Floyd (Tex) M. Ainsworth is available as <br />an independent contractor to perform these inspections at a rate of $66.00 per hour, plus one round <br />trip airfare to and from Texas and Alaska; and <br /> <br />WHEREAS, the total cost for these inspections is not expected to exceed $45,000 and is well <br />within the budgeted amount for these services; and <br /> <br />WHEREAS,funding is available within the budget approved by Council for the installation <br />of generator number six; and <br /> <br />WHEREAS,the proposed contract with Floyd M. Ainsworth is a contract for professional <br />services and is exempt from the City's competitive procurement procedures under Seward City Code <br />Section 6.10.120(8): <br /> <br />NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY <br />OF SEWARD, ALASKA, that: <br /> <br />Section 1. The City Manager is hereby authorized to enter into a contract with Floyd M. <br />Ainsworth to provide specialized inspection services for modifications to the structures at Ft. <br />Raymond Substation to accommodate the new generator and to oversee initial operation of the new <br />