Laserfiche WebLink
Sponsored by: Oates <br />CITY OF SEWARD, ALASKA <br />RESOLUTION 2009-020 <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEWARD, <br />ALASKA, AUTHORIZING THF. C[TY MANAGER TO ENTER INTO A <br />CONTRACT WITH FIARMON CONSTRUCTION FOR THE <br />CONSTRUCTION OF THE ADAMS STREET WATERFRONT PAVILION <br />FOR $312,000, PLUS AUTHORIZING ADDITIONAL PROJECT-RELATED <br />COSTS OF $33,000, AND APPROPRIATING FUNDS <br />WHEREAS, the Seward community has been eager to replace the Wellington pavilion and <br />Adams Street pavilion which were demolished in 2003 after an engineering assessment determined <br />the two structures were overstressed acid posed a potential hazard to the public; and <br />WHEREAS, the pavilion design was modeled after the historic Seward Depot located along <br />Railway Avenue and Fourth Street and the concept was approved by the City Council on June 26, <br />2006 by Resolution 2006-09; and <br />WHEREAS, a bid for construction for new ocean side pavilions to replace the structures at <br />both Adams Street and Ballaine and D Street and Ballaine was advertised on July 13, 2006 and again <br />on July 20, 2006 in both the Anchorage Daily News and the Seward Phoenix Log; and <br />.._ <br />WHEREAS, thirteen bid packages were sent out and one bid was submitted on August 10, <br />2006 by Swenson Construction, which is the former business name for the entity cun~ently doing <br />business as Harnion Construction; and <br />WHEREAS, on December 1 1, 2006 Resolution 2006-98 authorizing the City Manager to <br />enter into a contract with Swenson Construction for the construction of one waterfront pavilion in an <br />amount not to exceed 5397,000 and appropriating foods was postponed indefinitely; and <br />WH F,RF.AS, on February 20, 2009 Hannon Construction has submitted a revised proposal to <br />the City for value engineering the Adams Street pavilion which maintains the overall appearance of <br />the pavilion much the same as the original bid submitted in August 2006; and <br />WHEREAS, working with City staff, value engineering the project and with the help of <br />volunteers provided by the City, Harmon Construction has substantially reduced the cost of the <br />Adams Street pavilion; and <br />WHEREAS, landscaping, painting, installation of bench and picnic tables, rock facade on <br />barbeque, handicap walkway and other work will he completed by volunteers, staff and City of <br />Seward equipment; and <br />