HomeMy WebLinkAboutRes2013-011 Sponsored by: Administration
>r. CITY OF SEWARD, ALASKA
PLANNING AND ZONING COMMISSION
RESOLUTION 2013 -11
A RESOLUTION OF THE SEWARD PLANNING AND ZONING
COMMISSION OF THE CITY OF SEWARD, ALASKA, SUPPORTING
THE CONSTRUCTION OF THE ELECTRIC DEPARTMENT
WAREHOUSE; THE RELOCATION OF THE CITY WATER WELL
DRAINAGE DITCH AND PEDESTRIAN PATHWAY ON CITY OWNED
LOT 6A -2, FORT RAYMOND SUBDIVISION NO. 3; AND THE
CONSTRUCTION OF THE CONNECTING PUBLIC SIDEWALK; ALL
LOCATED AT 605 SEA LION AVENUE WITHIN THE INSTITUTIONAL
ZONING DISTRICT
WHEREAS, Lot 6A -2, Fort Raymond Subdivision No. 3 contains approximately 10.7
acres, located south of Sea Lion Avenue and the private Kenai Peninsula Borough (KPB) school
driveway access; north of the community cemeteries; east of the KPB school baseball field and
west of the City owned Air Force lease parcel; and
WHEREAS, City Council Resolution 2012 -001, approving the land exchange between
the KPB and the City for a small portion of this parcel, stated the use of the land would go before
Planning and Zoning Commission; and
WHEREAS, the parcel is located within the Institutional Zoning District (INS) and
contains the City Electric Department generation plant, Public Works water wells and the City
baseball field; and
WHEREAS, in accordance with the Land Uses Allowed Table (15.10.225), the proposed
warehouse structure and use is allowed outright within the Institutional District; and
WHEREAS, the warehouse shall meet all City building code requirements with
engineered stamped drawings; and
WHEREAS, the relocation of the drainage ditch, pedestrian pathway and construction of
the connecting sidewalk have all been engineered to meet current construction standards.
NOW, THEREFORE, BE IT RESOLVED by the Seward Planning and Zoning
Commission that:
Section 1. The Commission supports the construction and use of the Electric Department
warehouse on City owned Lot 6A -2, Fort Raymond Subdivision No. 3.
Seward Planning and Zoning Commission
Resolution No. 2013 -11
Page 2 of 2
Section 2. The Commission further supports the relocation of the water well drainage
ditch and pedestrian pathway on City owned Lot 6A -2, Fort Raymond Subdivision No. 3.
Section 3. The Commission further supports the construction of paved flares where the
pedestrian pathway connects with the sidewalk at Sea Lion Drive.
Section 4. The Commission further supports the construction of the connecting sidewalk
located abutting the KPB school campus private driveway.
Section 5. This resolution shall take effect immediately upon its adoption.
PASSED AND APPROVED by the Planning and Zoning Commission of the City of Seward,
Alaska, this 22 day of May, 2013.
THE CITY OF SEWARD
.411
Sandie Roach', Ch.'
AYES: Butts, Campestre, Fleming, Ecklund, McClure, Roach'
NOES: None
ABSENT: None
ABSTAIN: None
VACANT: One
A TE T:
/
J� hanna Kinney, CMC
• ty Clerk
. ,,,nSSea .a3 t♦
(City Seal) 0�° `'' .
• • •
• e e
.40 1amFeM • e, •